How to improve the production efficiency of injection mold workshop?

As a high value-added and highly technology-intensive industry, mold industry has become the foundation of industrial development. Mold processing technology is an important factor in mold development. According to the product material, the mold processing technology can be divided into metal mold processing and injection mold processing, in which the injection mold processing shows the momentum of strong development. In the field of production and life, more and more injection moulds have replaced the hardware parts of the past, and the processing and production of injection mold has become a mainstream in the mold processing industry. So how to improve the production efficiency of injection mold in injection mold?

First of all, the personnel allocation, since the injection mold factory needs to make injection molding in many times, so the main attention is the personnel establishment and arrangement in the injection molding workshop. Such as relevant proportion of technical personnel, operators, engineers, and subsequent warehouse operator, maintenance personnel, etc., require a certain amount of deployment, to guarantee the production workshop and safety indicators in place. With reasonable arrangement, the production of the workshop is in an orderly running state, which can ensure that all hands are actively playing their role.
The second point is regular meeting, for a production enterprise can be in the form of weeks to organize, main effect is the production, the problems in the work in time to listen to and the summary, is committed to solve main problems in production, reduce stress and conflict in work. At the same time, the main problems are left to be solved in the form of minutes, so as to facilitate future work.
The third point is the complete production plan, after the project import from the implementation of production to finished and prepared for the next project, during the period of production should be according to certain plans, convenient managers understand the progress and adjust.
Fourth is the division of work area, some jobs need and other post to cooperate, some jobs need according to the process to complete their work, it needs to be on different work according to certain rules on the division of work area, such as the finished product area, semi-finished products, rework area, security is responsible for the duty, health is responsible for the work, the machine is responsible for the duty, as well as the corresponding office area and production area, and so on. General enterprises will use red and yellow blue color to mark different areas, easy to identify.
The fifth is the security responsibility of each post, and the system of security responsibility to the post should be implemented so as to maximize the implementation of each security system, and everyone is responsible for the security work.
The sixth is to develop a unified standard, this is due to the different between the operator and technician will always be differences, in order to avoid such differences affect process operation in the process of production, so want to have a set of effective standard system, in which differences will remove it.

Down:Precision mold selection gate position to follow the principle.